Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
NPS Trailhead Life Cycle Cost Group

Net Present Value Cost Calculation View

Change by Yr

Introduction
This tool generates a variety of basic net present value statistics for DevTreks components and operations.

Calculation View Description
v210a

Version: 1.7.0

Feedback About commercial/operationgroup/NPS Trailhead Life Cycle Cost Group/757/operationnpvchangeyr

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions (beta)

Step 1

  • Step 1. The accompanying tutorial contains a reference that explains these analyzers.
  • Step 1. Base Calculations To Analyze: Make sure that the data being analyzed corresponds to outputs.
  • Step 1. Analysis Type:The Analysis Type that is saved should match the name of this analyzer.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
NPS Trailhead Life Cycle Cost Group
Operation Group : NPS Trailhead Life Cycle Cost Group ; NPS100
Operation AllAlt. 0Alt. 1Alt. 2
Name 2007 Trailhead Improvement 012008 Trailhead Improvement 012009 Trailhead Improvement 01
Date 12/31/200712/31/200812/31/2009
Label NPS1001ANPS1001ANPS1001A
Observations 222
Alternative AAA
OC Total 2,549.722,109.431,126.61
OC AmountChange 0.000.00-982.82
OC PercentChange 0.000.00-46.59
OC BaseChange 0.00-440.29-1,423.11
OC BasePercentChange 0.00-17.27-55.81
AOH Total 55.2542.9920.89
AOH AmountChange 0.000.00-22.10
AOH PercentChange 0.000.00-51.41
AOH BaseChange 0.00-12.26-34.36
AOH BasePercentChange 0.00-22.19-62.19
CAP Total 0.000.000.00
CAP AmountChange 0.000.000.00
CAP PercentChange 0.000.000.00
CAP BaseChange 0.000.000.00
CAP BasePercentChange 0.000.000.00
Total Total 2,604.972,152.421,147.49
Total AmountChange 0.000.00-1,004.93
Total PercentChange 0.000.00-46.69
Total BaseChange 0.00-452.55-1,457.48
Total BasePercentChange 0.00-17.37-55.95
Incent Total 2,604.972,152.421,147.49
Incent AmountChange 0.000.00-1,004.93
Incent PercentChange 0.000.00-46.69
Incent BaseChange 0.00-452.55-1,457.48
Incent BasePercentChange 0.00-17.37-55.95
Dataset: NPS Trailhead Life Cycle Cost Group IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress operation analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.